Concept
Play spec
Last updated
Also called: one-page play spec
A play spec is a short written definition of a play, agreed before building. It states the problem and hypothesis, who is included and excluded, what triggers the play, which data it needs, what the system and people do, how success is measured, and when to scale or kill it.
Why it matters
Most expensive GTM automation failures are decided before any code is written: a missing exclusion, an undefined owner, or no agreed measure. A one-page spec forces those decisions into the open, gives stakeholders something concrete to approve, and becomes the reference when the play is reviewed weeks later.
Worked example
For a hiring-signal outbound play, the spec's hypothesis reads "If we contact tier-2 accounts within a week of posting a RevOps role, meetings per 100 accounts will rise because they are building the function we serve." It excludes customers and open opportunities, sets a 10% holdout, names positive reply rate and qualified pipeline as measures with spam complaints as a guardrail, and says the play is killed if pipeline per account does not beat the holdout by the review date.
Common mistakes
- Skipping exclusions; emailing current customers as cold prospects is a classic spec failure.
- Writing measures without a comparison group, so results cannot be separated from what would have happened anyway.
- Omitting kill criteria, so weak plays run indefinitely.
- Letting the spec go stale after launch instead of versioning it with the play.
Questions
How long should a play spec be?
One page is usually right. The point is to force explicit decisions, not to write a requirements document.
Who approves the spec?
The owner of the human actions (for example, the SDR or AE leader) and the GTM engineer who owns the system should both agree to it, especially the measures and kill criteria.