Play prioritization
Last updated
Also called: bottleneck prioritization, impact confidence leverage effort
Play prioritization is the habit of scoring each candidate project on impact, confidence, leverage, and effort, then ranking by (impact × confidence × leverage) / effort. The leverage term rewards work that benefits many teams or future plays, such as shared data and routing.
Why it matters
A GTM engineer always has more requests than capacity. Without an explicit model, the most recent or loudest request wins and infrastructure work never gets done. Scoring makes the trade-offs visible and gives stakeholders a fair way to argue for re-ranking with evidence.
Worked example
Two requests arrive. A custom report for one manager scores impact 3, confidence 5, leverage 1, effort 1, for a priority of 15. Fixing account matching, which every routing and signal play depends on, scores 4, 4, 5, and 4, for a priority of 20. The matching fix goes first, and the report is scheduled for the reserved capacity kept for small requests.
Common mistakes
- Treating the score as precise; its value is the conversation it forces.
- Leaving out leverage, which systematically undervalues foundations.
- Running intake through direct messages instead of a single front door with weekly triage.
- Never showing stakeholders what was declined and why.
Questions
How is this different from ICE or RICE?
It borrows their structure but adds leverage, because GTM infrastructure (matching, routing, data quality) pays off across many plays and would otherwise always lose to quick wins.
How much capacity should be held back for urgent work?
The book suggests reserving some capacity, perhaps a fifth, for urgent fixes and small requests so that planned work is not constantly interrupted.