# Starting-stack picker

> Interactive tool and worksheet from *The GTM Engineering Handbook* by Jared Waxman (GTM Engineer School).  
> Web version: https://gtm-engineer-school.com/resources/gtme-handbook/tools/stack-picker/  
> Last updated: 2026-11-28  
> © 2026 Jared Waxman. All rights reserved. Short quotations with attribution and a link are welcome.

A short questionnaire that suggests a starting GTM stack by company stage. It runs in your browser, does not save or send your answers, and uses illustrative tool names.

The interactive picker is on the HTML page. The worksheet below is the same one as in Section 14.8, and works in this markdown edition.

Use this worksheet if you are reading a print or Word edition, or if you would rather think on paper. On the web, an interactive version asks the same questions and returns a starting stack: it lives at the stack picker page of this site (`/tools/stack-picker/`). Neither version tracks your answers. Tool names in the result are illustrative examples, not a shopping list.

Circle one answer in each row, then use the notes under the table.

| Question | Your answer |
|---|---|
| What is the company's stage? | Seed · Series A to B · Growth or scale-up · Enterprise |
| Which CRM is in use today? | Salesforce · HubSpot · Another CRM · None yet |
| How many people will build and run GTM systems? | Just me · Two to five · Six or more |
| Do you already have a data warehouse you can use for GTM? | Yes · No |
| How tight is tooling budget right now? | Tight; I need to justify every new tool · Moderate; a short core stack is fine · Flexible |
| What is the main revenue motion to systematize first? | Inbound · Outbound · Product-led · A mix |

**How to read your answers.**

1. Start from the sample stack above that matches the stage you circled. That is the base.
2. Keep the CRM you already have. If you circled “None yet,” choose a CRM first; it is the system of record (Chapter 11). Do not plan a migration until the motion is systematized.
3. If you are a team of one, or budget is tight, prefer CRM-native automation and fewer paid tools. Add a general workflow tool only for jobs the CRM cannot do.
4. If you already have a warehouse, use it for scoring and measurement (Chapter 7) and plan reverse ETL when scores must return to the CRM. If you do not, do not buy one at the seed stage; at Series A to B, start one when history or scoring actually hurts.
5. Let the main motion set the first plays, not the first purchases: inbound points to Chapter 9 and Playbook 1; outbound to Chapters 8 and 20 and Playbook 4; product-led to Chapter 9 and Playbook 6.
6. Write a one-page play spec (Chapter 2) for the first system you will actually ship, and estimate cost from current vendor pages at your expected volume (Section 14.7). This book does not publish unsourced monthly totals.

Tool names below are illustrative examples, not recommendations or a required stack. Use whatever already works in your company unless you have a reason to change. Pricing depends on volume, contract, and the month you look; this book does not publish unsourced monthly totals. Estimate cost from current vendor pages at the volume you actually expect, as Section 14.7 describes.

#### Seed, or the first GTM hire

A founding or first GTM engineer, often at seed or just after, with a founder-led or small sales motion and little existing RevOps structure.

*When this is the stage, a typical starting stack looks like this (examples are illustrative).*

| Function | What to do | Illustrative examples |
|---|---|---|
| CRM | Use the system of record you already have. Do not migrate it now. | HubSpot or a small Salesforce org are common examples. |
| Enrichment | One or two providers, or a starter seat on an orchestration platform, is enough. | A single email or firmographic provider; Clay as an example orchestration layer. |
| Workflow automation | Prefer CRM-native automation. Add a general workflow tool only for jobs the CRM cannot do. | HubSpot workflows or Salesforce Flow; n8n, Zapier, or Make for the exceptions. |
| Sequencing | Start with CRM-native sequences. | HubSpot sequences or Salesforce-native cadence tools. |
| Email and deliverability | Company mailboxes plus basic authentication, before any volume increase. | Google Workspace or Microsoft 365, with SPF, DKIM, and DMARC (Chapter 20). |
| Warehouse | Skip until reporting, identity resolution, or history actually hurts. | None at this stage. |
| AI | Draft and classify behind human review; use a coding agent for small scripts. | A model API, or an orchestration platform's research column; Claude Code or Cursor as coding-agent examples. |

**What to add next, and why.** A written play spec and a play ID habit (Chapters 2 and 15); deliverability monitoring; a second enrichment source if coverage on your segment is weak (Chapter 4). A warehouse is usually not the next purchase. The risk at this stage is over-building. Chapter 18 warns against a twenty-step enrichment waterfall for a company that sends a hundred emails a week. Speed and focus beat completeness.

#### Series A to B

A repeatable motion exists, a small sales or marketing team is in place, and one person can no longer hold the system in a spreadsheet and a handful of CRM automations.

*When this is the stage, a typical starting stack looks like this (examples are illustrative).*

| Function | What to do | Illustrative examples |
|---|---|---|
| CRM | Keep the current system of record; invest in the object model and field ownership (Chapter 11). | Salesforce or HubSpot, whichever you already run. |
| Enrichment and orchestration | A dedicated GTM orchestration layer for waterfalls, research, and list work. | Clay is the orchestration example most often named in 2026 job postings (Section 14.1). |
| Workflow automation | A general workflow tool for cross-system jobs the orchestrator and CRM should not own. | n8n, Zapier, or Make. |
| Sequencing | Add a sequencer if outbound is a real motion; otherwise stay CRM-native. | A sales-engagement tool, CRM-native sequences, or Clay Sequencer as an example. |
| Conversation intelligence | Add when call volume is high enough that notes are falling through. | Gong is the example named in Section 14.1. |
| Warehouse and modeling | Start a warehouse when you need history, scoring, or measurement the CRM cannot hold. | BigQuery, Snowflake, or Postgres; dbt for models (Chapter 7). |
| Ingestion and activation | Add reverse ETL when warehouse scores and audiences must return to the CRM. | Hightouch or Fivetran Activations (Census) as examples. |
| AI | Production prompts with evaluation and a human gate (Chapter 12). | Model APIs; constrained research steps in the orchestration layer. |

**What to add next, and why.** Holdouts and play-level attribution (Chapter 15); reliability basics such as retries, monitoring, and a runbook (Sections 14.4 and 14.5); a thin context layer (Chapter 13). Volume and the number of motions have outgrown informal tooling, but the company can still standardize on a short list. This is the stage at which a core stack (orchestration, CRM, workflow tool, and code) usually settles.

#### Growth, or scale-up

Several motions run in parallel, more than one GTM engineer or a mix of GTM and RevOps is involved, and reliability, cost per outcome, and measurement start to matter as much as speed.

*When this is the stage, a typical starting stack looks like this (examples are illustrative).*

| Function | What to do | Illustrative examples |
|---|---|---|
| CRM | Treat the CRM as the action system of record, with a governed object model. | The CRM you already run, usually Salesforce or HubSpot at this stage. |
| Warehouse-native layer | Score, identity-resolve, and measure in the warehouse; activate back to tools (Chapter 7). | Snowflake, BigQuery, or Databricks; dbt; a reverse ETL tool. |
| Enrichment | A waterfall across several providers, with validation and a cost cap (Chapter 4). | An orchestration platform such as Clay in front of specialized providers. |
| Routing and workflow | Dedicated routing if CRM-native rules are bursting; workflow tools and code for the rest (Chapter 9). | A routing tool or CRM-native rules; n8n, Zapier, Make, or code. |
| Context layer | A maintained company brain for people and agents (Chapter 13). | A version-controlled repository of claims, plus a retrieval layer; vendor platforms if they pass a build-versus-buy review. |
| Reliability and observability | Service levels, alerts with owners, runbooks, and a weekly health review (Sections 14.4 and 14.5). | Whatever monitors your warehouse, workflow tool, and inboxes; the inventory is more important than the logo. |
| AI and agents | Evaluated steps with tool access and human-in-the-loop on consequential actions (Chapter 12). | Model APIs, MCP connections, coding agents for internal tools. |

**What to add next, and why.** A consolidation review before the next wave of renewals (Section 14.6); a clearer split between a platform team and embedded GTM engineers (Chapter 17); unit economics by play (Chapter 15). The failure mode flips from "too little system" to "too many tools and too little proof." Scaling here means reliability and subtraction as much as addition.

#### Enterprise

Formal change control, security review, and procurement sit in front of any new tool. A CRM and usually a warehouse are already approved, and ripping either out is rarely the job.

*When this is the stage, a typical starting stack looks like this (examples are illustrative).*

| Function | What to do | Illustrative examples |
|---|---|---|
| CRM and warehouse | Keep the approved systems; improve governance, object model, and activation around them. | The company's existing Salesforce (or equivalent) and warehouse (Snowflake, BigQuery, or similar). |
| Everything else | Map functions to the landscape in Section 14.1, then fill gaps only with tools that can pass review. | The same categories as the growth stack, chosen from the approved vendor list. |
| Security and legal | SSO, a data processing agreement, residency, deletion, and a documented exit plan (Section 14.7). | Whatever your security team already standardizes on; do not bypass it for a GTM tool. |
| Build versus buy | Lean toward approved platforms and build differentiating logic on top (Section 14.3). | An approved orchestration or workflow platform, plus version-controlled code and prompts. |
| Reliability | Incident reviews, service levels, and change discipline are part of shipping, not extras. | Existing enterprise observability and IT change processes, adapted to GTM plays. |

**What to add next, and why.** Often subtraction: retire overlapping tools, publish an evaluation standard, and bring incident reviews into the weekly rhythm. A clever tool that cannot pass review will not ship. Vendor risk, data governance, and change control dominate. The job is to make the approved stack do GTM work reliably, not to recreate a start-up stack inside a large company.

---

All concepts: [concepts.md](https://gtm-engineer-school.com/resources/gtme-handbook/concepts.md) · Practitioner questions: [questions.md](https://gtm-engineer-school.com/resources/gtme-handbook/questions.md) · All chapters: [llms.txt](https://gtm-engineer-school.com/resources/gtme-handbook/llms.txt)
